J046--FY25: Water Treatment and Chemistry Services for Cooling Towers and Chillers Base plus 4 Year
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Presolicitation (Updated)
-
Updated Published Date: Aug 20, 2025 07:59 am CDT
-
Original Published Date: Aug 13, 2025 05:31 pm CDT
-
Updated Response Date: Aug 25, 2025 10:00 am CDT
-
Original Response Date: Aug 20, 2025 10:00 am CDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Aug 28, 2025
-
Original Inactive Date:
Aug 23, 2025
-
Initiative:
Classification View Changes
Description View Changes
Clarification Questions:
System Scope & Access
Could you kindly confirm the approximate number and type of cooling towers, chillers, and any closed-loop systems (e.g., hot water, glycol) that will be covered under this contract?
Information is in Introduction to PWS. Chiller type-TRANE; Cooling Tower type EVASCO.
Chemical Delivery & Storage
Will the VA accept routine chemical deliveries (e.g., in totes or drums) to a designated mechanical area on site, or are there restrictions on storage location, access hours, or container size?
Information is in PWS. Chemical and testing Supplies. See item 9, 10. Vendor must consult with Boiler/Chiller plant manager on details.
Service Schedule Expectations
Is monthly on-site service expected for all systems? Would any systems require seasonal startup/shutdown support, or is year-round service anticipated?
Follow PWS, manufactures instructions and best practices. (See performance requirements.)
Corrosion Coupon Program
Will the contractor be expected to provide corrosion coupons and holders, or are those already installed on site? If so, are we responsible for full analysis and reporting?
Follow PWS, manufactures instructions and best practices.
Reporting Requirements
Would you prefer digital service reports to be submitted via email/PDF, or is there a VA platform (such as TMS or SharePoint) required for uploads?
Digital service reports via email/PDF is acceptable. If this changes we will advise.
Emergency Support
Are vendors expected to offer 24 48 hour emergency response for water quality or biological issues (e.g., suspected Legionella events)? If so, please confirm expected response time and point of contact protocol. Information in PWS under Chemical water Treatment Contractor Qualifications Item 3. (Must be within a 100 miles of the site to provide a reasonable response time.)
Evaluation Factors
Will the evaluation be conducted strictly under a Lowest Price Technically Acceptable (LPTA) approach, or will the government consider past performance or technical narrative as part of a broader assessment? Defer to CO
Labor vs. Materials Breakdown
Should chemicals, corrosion analysis, and testing be priced as separate line items, or should these be bundled into a flat monthly rate?
Defer to CO
Annual Estimate (for Planning)
While we understand that previous vendor data isn t provided, would you be able to share a rough estimate of expected annual service frequency or volume of chemical usage to help us appropriately size our proposal?
No information.
Attachments/Links
Contact Information View Changes
Contracting Office Address
-
ONE FREEDOM WAY
-
AUGUSTA , GA 30904
-
USA
Secondary Point of Contact
History