| Location: | Utah |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 25, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CR27008 |
| Publication URL: | To access bid details, please log in. |
Project Description: Stage II Invitation to Bid
Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.
The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project:
Project Description: This project includes removing and replacement of a direct buried condensate line between two concrete vaults with insulated piping. The contractor shall be responsible to provide the correct slope of the condensate line between the two vaults. Contractor shall provide new asphalt paving of the removed parking lot and road. Provide new curbing, gutter and sod repair where applicable.
Construction Cost Estimate: $490,000.00

With GovernmentContracts, you can:
...Project: Upper PI Pond Joint Repair Ref. #: PI2026001 Department: CITIES - American ...
State Government of Utah
Bid Due: 10/05/2026
...included (concrete section repair/refurbishment is not considered in the RFP). The County's estimated... ...
State Government of Utah
Bid Due: 9/28/2026
...Outlet Works. Repairs include pipe support concrete pad repairs and restoration. ... exterior ...
State Government of Utah
Bid Due: 9/23/2026
...Holladay Sidewalk Repair Project Full bid document Bidders are invited to bid on ...
Holladay city
Bid Due: 9/24/2026