| Location: | Colorado |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Sep 3, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA2543RFQTF0003 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
REQUEST FOR QUOTES – Buckley Space Force Base, Colorado
Shade Structure Fabric Replacement and Installation
The Buckley Space Force Base (Buckley SFB) A-Basin Child Development Center (A-Basin CDC) is requesting quotes to replace worn shade structure fabrics and cables for three (3) existing frame/structures.
The three (3) frame/structures are designated as Pre-Toddler, Toddler, and Preschool. Measurements/Requirements for each are provided below:
Pre-Toddler:
Shade Size: 15’ x 15’
Unit Type: 4-point Sails
Entry Height: 10’
Number of Columns: 4
Number of Fabric Types: 2
Cable/Hardware Finish: Galvanized
Toddler:
Shade Size: 25’ x 18’
Unit Type: 4-point Sails
Entry Height: 10’
Number of Columns: 4
Number of Fabric Types: 2
Cable/Hardware Finish: Galvanized
Preschool:
Shade Size: 28’ x 20’
Unit Type: 4-point Sails
Entry Height: 10’
Number of Columns: 4
Number of Fabric Types: 2
Cable/Hardware Finish: Galvanized
Delivery:
Liftgate required, limited access delivery. The contractor shall deliver three 4-point sails to meet the above requirements no more than 60 days after receipt of the order. Sails shall be delivered to Building 351, located at Buckley Space Force Base, CO 80011.
Delivered items will be inspected and accepted by the government officials responsible for receiving the products and performing any required inspections.
Installation:
The Contractor shall be responsible for the removal and off-base disposal of the existing fabric & cabling, and shall install and tension the new fabric, complete with hardware.
| Aug 29, 2025 | [Solicitation (Updated)] Updated with Pics - Shade Structure Fabric Replacement and Installation |
| Sep 2, 2025 | [Solicitation (Updated)] Updated with Pics and New Measurement - Shade Structure Fabric Replacement and Installation |

With GovernmentContracts, you can:
...Fiber Optic Cabling Solicitation Document Docusign Envelope ID: AEB20D52-379E-8450-83F0-127F8CE46F7A... CITY OF THORNTON REQUEST ...
City of Thornton
Bid Due: 6/24/2026
...Fiber Optic Cabling Solicitation Document Docusign Envelope ID: AEB20D52-379E-8450-83F0-127F8CE46F7A... CITY OF THORNTON REQUEST ...
City of Thornton
Bid Due: 6/24/2026
...generators, fuel tanks, pathways and cabling, and shelters. NOTE: SPECIFICATIONS AND DRAWINGS CONTAIN...
DEPT OF DEFENSE
Bid Due: 6/18/2026