| Location: | Colorado |
|---|---|
| Posted: | Jul 31, 2025 |
| Due: | Aug 29, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT25R0039 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS
07/31/2025: Amendment 0001 (A0001): See and read the following in association with Amendment 0001: Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings. The Updated Attachments along with A0001 are located in the Attachments/Links.
The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom.
Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details.
Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details.
An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list.
| Jul 29, 2025 | [Solicitation (Original)] SOUTH PARK DISTRICT OFFICE REHAB |
| Aug 14, 2025 | [Solicitation (Updated)] SOUTH PARK DISTRICT OFFICE REHAB |

With GovernmentContracts, you can: