| Location: | Alaska |
|---|---|
| Posted: | Jul 31, 2025 |
| Due: | May 2, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911KB25RA010 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***********************************************************************
THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS:
BRISTOL BUILDING CONSTRUCTORS, LLC
RED POINT CONSTRUCTION, LLC
STG PACIFIC, LLC
***********************************************************************
This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced. The signage for the generators and bulk fuel storage tanks must be replaced.
Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator. 30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.
| Mar 8, 2025 | [Presolicitation (Original)] REPLACE GENERATORS, CHPP, EIELSON AIR FORCE BASE, ALASKA (EIE488) |
| Mar 27, 2025 | [Solicitation (Original)] EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA |
| Apr 18, 2025 | [Solicitation (Updated)] EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA |
| Apr 24, 2025 | [Solicitation (Updated)] EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA |

With GovernmentContracts, you can:
RFP 3120003350 - Fire Trucks and Fire Apparatus On Behalf of NASPO ValuePoint,
State Government of Alaska
Bid Due: 6/10/2026
+ 2026P031 Provide AWWU Expert Financial Services Click here to be added to
City of Anchorage
Bid Due: 6/04/2026
Follow RFLP Artificial Intelligence (AI) Data Center Development at Joint Base Elmendorf Richardson,
DEPT OF DEFENSE
Bid Due: 6/29/2026
Follow RFLP Artificial Intelligence (AI) Data Center Development at Joint Base Elmendorf Richardson,
DEPT OF DEFENSE
Bid Due: 6/29/2026