Murrieta Creek Phase 2B

Location: California
Posted: Jun 17, 2025
Due: Jul 2, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W912PL25BA004
Publication URL: To access bid details, please log in.
Follow
Murrieta Creek Phase 2B
Active
Contract Opportunity
Notice ID
W912PL25BA004
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION SOUTH PACIFIC
Office
W075 ENDIST LOS ANGELES
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Jun 17, 2025 02:55 pm PDT
  • Original Published Date: May 02, 2025 01:42 pm PDT
  • Updated Date Offers Due: Jul 02, 2025 02:00 pm PDT
  • Original Date Offers Due: Jun 04, 2025 02:00 pm PDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Jun 17, 2026
  • Original Inactive Date: May 02, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Murrieta Creek, Riverside County, CA Temecula , CA 92590
    USA
Description View Changes
*Amendment 0005 Posted 6/17, PLA Requirements and Updated Bid Opening Participation instructions* *Amendment 0004 posted on 6/10, Bid opening date extended* *Amendment 0003 posted on 6/4* *AMENDMENT 0002* *Note prior Amendment 0001 attachment and attachment of original Solicitation* The Murrieta Creek Phase 2B channel widening starts from the upstream end of Phase 2A (Station 98+80) and continues to approximately 5,220 feet (Station151+00). The invert of the channel consists of a maintained channel area and riparian vegetation corridor. **Please reference the following Documents attached for further details: Solicitation VOL 1, Appendices VOL 2, Plans/Spec Set, Site Visit Itinerary, Map GENERAL SCOPE: (Groundwater monitoring plan)(Comprehensive dewatering plan to keep excavation dry)(Monitoring well installation)(Instrumentation)(Dewatering system removal)(Temporary shoring)(Demolition and debris removal)(Strip/Stockpile topsoil)(Existing riprap removal)(Shoring design and installation)(Precise installation/monitoring of inclinometers)(500,000 cubic yards large scale excavation)(Detailed survey control)(Protection of large sewer utilities)(Relocation large water utilities)(Large scale compacted fill)(Large scale riprap installation) (grouted riprap slopes at confluences)(Extensive series of side drain structures) (overbank aesthetics landscaping, right of way)(A/C Paving for roadways) (several access ramps) (maintenance road/trail, riparian vegetation corridor)(Extensive concrete v-ditch system)(Embankment subdrain system)(Planting/hydroseeding)(Temporary irrigation system)(plant establishment)(Install grade stabilizer)(galvanized posts and cable fence), (access gate).Utilities:? RCWD 36 inch line: Existing 36 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 36 inch steel pipe will be encased in a 60 inch steel casing.? RCWD 12 inch line: Existing 12 inch steel pipe to be abandoned in-place and removed by the Contractor.? RCWD 24 inch line: Existing 24 inch steel pipe to be relocated approximately 15 inches upstream of its current location. The new 24 inch steel pipe will be encased in a 42 inch steel casing.? EMWD 12 inch and 24 inch sewer lines: Existing 12 inch and 24 inch sewer lines and existing concrete encasements to be protected in-place; the lines are roughly parallel and within 11 inches of each other. The Contractor will construct a protection structure over the lines using CMLC and concrete.? SCG 4 inch HP gas line: SCG will perform the relocation of the existing 4 inch HP gas line. The new alignment will run along the current low flow crossing
Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 915 WILSHIRE BLVD SUITE 1109
  • LOS ANGELES , CA 90017-3409
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Apr 18, 2025[Presolicitation (Original)] Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration
Apr 21, 2025[Presolicitation (Updated)] Murrieta Creek, Phase 2B: Buried Riprap Bank Protection and Ecosystem Restoration
May 2, 2025[Solicitation (Original)] Murrieta Creek Phase 2B
May 29, 2025[Solicitation (Updated)] Murrieta Creek Phase 2B
Jun 4, 2025[Solicitation (Updated)] Murrieta Creek Phase 2B
Jun 10, 2025[Solicitation (Updated)] Murrieta Creek Phase 2B
Jul 1, 2025[Solicitation (Updated)] Murrieta Creek Phase 2B
Jul 2, 2025[Solicitation (Updated)] Murrieta Creek Phase 2B
Jul 7, 2025[Solicitation (Updated)] Murrieta Creek Phase 2B
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...approximately 80 percent of Zone 7's water supply, with the remainder coming from ...

Zone 7 Water Agency

Bid Due: 6/18/2026

..., treating, or stabilizing hazardous substances. * Groundwater Remediation: Treating contaminated... groundwater to ...

Humboldt County

Bid Due: 7/19/2026

...Repairs,Water Service Maintenance,Water Supply, Groundwater, WWTP, Equip.,Waterworks Installation Bid... Maintenance, Water Supply, Groundwater, ...

City of Glendora

Bid Due: 7/02/2026

...percent groundwater produced from District-owned and operated wells. The District provides water...

Mission Springs Water District

Bid Due: 6/12/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.