| Location: | Mississippi |
|---|---|
| Posted: | Oct 22, 2024 |
| Due: | Nov 29, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W9127824Q0015 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
a. This amendment is to extend the Solicitation close date to 30 November 2024.
b. Any questions about this solicitation, shall be submitted via the Bidder Inquiry Portal in ProjNet at https://www.projnet.org/projnet. See Section L.
c. An additional Amandment will be posted for the location, date and time of Site Visit.
The Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project is located in southwestern Mississippi near Waveland, in Hancock County. The project site is adjacent to and west of the federally authorized Cadet Bayou navigation project. Cadet Bayou is about 21 miles to the west of the Port of Gulfport and is about 44 miles to the east of New Orleans, Louisiana. The Bayou Caddy Ecosystem Restoration Project consists of a 22-acre site of restored marsh contained by a 2,000-foot-long geotextile tube (Figure 1). The most recent portion of the project consists of a 1,000-foot-long by 25-foot-wide rock breakwater combined with a 1,700-foot-long segmented living shoreline system consisting of prefabricated concrete wave attenuation devices (WADs) that protect the ecosystem restoration project from excessive wave action and storm damage as seen in the figures below. Based on the preivous field survey team, the acreage of the phragmites was approximately 1.2 acres but may have changed since last field visit in Spring ’24
| Sep 24, 2024 | [Combined Synopsis/Solicitation (Original)] Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project |
| Oct 11, 2024 | [Combined Synopsis/Solicitation (Updated)] Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project |
| Nov 14, 2024 | [Combined Synopsis/Solicitation (Updated)] Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project |
| Nov 18, 2024 | [Combined Synopsis/Solicitation (Updated)] Bayou Caddy Ecosystem Restoration (Shoreline Stabilization) project |

With GovernmentContracts, you can: