CO FTNP DINO 11(1) Harpers Corner Road

Agency: TRANSPORTATION, DEPARTMENT OF
State: Colorado
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Posted: Oct 3, 2022
Due: Oct 18, 2022
Solicitation No: 6982AF22B000021
Publication URL: To access bid details, please log in.
Follow
CO FTNP DINO 11(1) Harpers Corner Road
Active
Contract Opportunity
Notice ID
6982AF22B000021
Related Notice
6982AF-22-SS-0025
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Original Published Date: Oct 03, 2022 01:47 pm MDT
  • Original Response Date: Oct 18, 2022 02:00 pm MDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date:
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Dinosaur , CO 81610
    USA
Description

THIS IS NOT A REQUEST FOR BID



PLANS AND SPECIFICATIONS ARE NOT AVAILABLE AT THIS TIME



PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the National Park Service (NPS) is proposing to rehabilitate (3R) the pavement and curb conditions for Harpers Corner Road within the Dinosaur National Monument. The project is located in Moffat County near Dinosaur, CO and will consist of rehabilitating approximately 14 miles of the road and one (1) parking area. Harpers Corner Road needs rehabilitation due to deterioration that is typical of aging pavements and due to several subgrade failures.



SCOPE OF THE WORK: The project scope is rehabilitation of existing roads, pullouts and parking areas so that visitors can continue to safely access park destinations.



The existing pavement along Harpers Corner Road is generally in moderate condition with several moderate to high severity subgrade failures. The existing posted speed along the route is 45 mph. This roadway is classified as an NPS Class 1 roadway; a principal park road/rural parkway with one lane in each direction. The existing roadway is paved and varies from 22 to 30 feet in width along the entire 14 miles with an approximate 2% normal crown and superelevation and corner widening, as needed on curves. Existing drainage is adequate with the exception of one subgrade failure where a new culvert is proposed. The asphalt curb and gutter is completely buried in several locations and overrun with vegetation and debris on others. Guardrail is generally in good condition but will be replaced to be meet current MASH requirements.



The project will be split into a base schedule encompassing 4.33 miles, and 2 options, encompassing 2.73 miles and 7.06 miles. It will require minor widening where the existing width is less than 24 feet, as well as the addition of minor drainage improvements and concrete curbs. Improvements also include embankment, full-depth reclamation, asphalt concrete pavement, guardrail, concrete curb, culverts, gates, ADA improvements, pavement markings and subexcavation.



The project will be constructed under temporary single lane closures requiring temporary traffic control. All work occurs within environmentally sensitive settings which will require best management practices and restrictions to protect identified resources.



PRINCIPAL WORK ITEMS:



Approximate quantities for major work items (Schedules and Options):




  • 4,200 cubic yards of subexcavation

  • 2,400 cubic yards of embankment

  • 7,000 tons of roadway aggregate

  • 225,000 square yards of full depth reclamation

  • 46,000 tons of asphalt concrete pavement (superpave)

  • 840 linear feet of underdrain system

  • 33,000 linear feet of concrete curb



ESTIMATED COST RANGE: The project is between $10,000,000 and $20,000,000.




Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Nov 4, 2022[Solicitation (Original)] CO FTNP DINO 11(1) Harpers Corner Road
Nov 9, 2022[Solicitation (Updated)] CO FTNP DINO 11(1) Harpers Corner Road
Dec 15, 2022[Solicitation (Updated)] CO FTNP DINO 11(1) Harpers Corner Road
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow J--CRANE TESTING, REPAIR AND REPLACEMENT Active Contract Opportunity Notice ID 140R3024R0001 Related

Federal Agency

Bid Due: 12/11/2024

Follow NAF OFF BASE PRIORITY CHILD CARE REFERRALS Active Contract Opportunity Notice ID

Federal Agency

Bid Due: 8/30/2028

Details Due Date: 05/21/2024 2:00 pm Bidding Number: RFP-041-24 Bidding Categories: Resource Conservation

Boulder County

Bid Due: 5/21/2024

Chelsea Carnoali, MPA Partnership Strategist Eagle County Public Health and Environment 970-471-4827 chelsea.carnoali@eaglecounty.us

Eagle County

Bid Due: 5/06/2024

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only as a convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.