New Hampshire Department of Transportation Government Contract Opportunities & Archives
Access open contracts from city, county, educational, state and federal governments. Sign up today and gain instant access to the latest bid opportunities and receive Daily Contract Alerts matched to your business profile.
Scope: Installation of wrong-way countermeasures at controlled access interchanges (Statewide Wrong Way Driving 44866)
New Hampshire | State & Local Save
Due: 12/03/2026
Posted: 11/12/2026
Scope: Chip sealing various Tier 3 and 4 roadways. Addendum 1 (Statewide Chip Seal 2026 43287)
New Hampshire | State & Local Save
Due: 11/19/2026
Posted: 11/12/2026
Scope: Construction of a roundabout at entrance to Derryfield School at River Rd/Bicentennial Rd intersection Addendum 1 (Manchester 42886)
New Hampshire | State & Local Save
Due: 11/12/2026
Posted: 11/06/2026
Scope: Reconstruction of railway-highway crossing, roadway approaches and protective devices (Gorham 170-984F &170-985M) Addendum 2 (Gorham 42239)
New Hampshire | State & Local Save
Due: 11/19/2026
Posted: 10/29/2026
Scope: Resurfacing various Tier 2 roadways (Stoddard-Antrim-Hillsborough 45084)
New Hampshire | State & Local Save
Due: 11/19/2026
Posted: 10/28/2026
Scope: Chip sealing various Tier 3 and 4 roadways. (Statewide Chip Seal 2026 43287)
New Hampshire | State & Local Save
Due: 11/19/2026
Posted: 10/28/2026
Scope: Address bridge carrying US 3 and NH 11 over Mile Hill Rd. in the City of Laconia (121/028) (Laconia 41469)
New Hampshire | State & Local Save
Due: 11/19/2026
Posted: 10/28/2026
Scope: Hampton/No. Hampton bridge bundle Preservation project of 3 bridges (Hampton-North Hampton 45127)
New Hampshire | State & Local Save
Due: 11/19/2026
Posted: 10/28/2026
Scope: Reconstruction of railway-highway crossing, roadway approaches and protective devices (Gorham 170-984F &170-985M) Addendum 2 (Gorham 42239)
New Hampshire | State & Local Save
Due: 11/05/2026
Posted: 10/28/2026
Scope: Construction of a roundabout at entrance to Derryfield School at River Rd/Bicentennial Rd intersection (Manchester 42886)
New Hampshire | State & Local Save
Due: 11/12/2026
Posted: 10/20/2026
Scope: Resurfacing I-93 from Ashland to Plymouth Addendum 1 (Ashland-Plymouth 45459)
New Hampshire | State & Local Save
Due: 10/29/2026
Posted: 10/20/2026
Resurfacing I-93 from Ashland-Plymouth
New Hampshire | State & Local Save
Due: 10/22/2026
Posted: 10/16/2026
Scope: Reconstruction of railway-highway crossing, roadway approaches and protective devices (Gorham 170-984F &170-985M) Addendum 1 (Gorham 42239)
New Hampshire | State & Local Save
Due: 11/05/2026
Posted: 10/14/2026
Statewide Tier 2 Resurfacing (East) 45083 .pdf Scope: Various resurfacing of Tier 2 roadways
New Hampshire | State & Local Save
Due: 10/22/2026
Posted: 9/30/2026
Scope: Reconstruction of railway-highway crossing, roadway approaches and protective devices (Gorham 170-984F &170-985M) (Gorham 42239)
New Hampshire | State & Local Save
Due: 10/22/2026
Posted: 9/30/2026
Scope: Resurfacing I-93 from Ashland to Plymouth (Ashland-Plymouth 45459)
New Hampshire | State & Local Save
Due: 10/22/2026
Posted: 9/30/2026
Scope: Replacement of 4 ft x 5.5 ft stone walled, concrete deck culvert just north of Locke Rd. (Rye 43002)
New Hampshire | State & Local Save
Due: 10/08/2026
Posted: 9/30/2026
Scope: Replacement of 4 ft x 5.5 ft stone walled, concrete deck culvert just north of Locke Rd. (Rye 43002)
New Hampshire | State & Local Save
Due: 10/08/2026
Posted: 9/15/2026
Scope: Reconstruct NHDOT stone revetment seawalls/berms. Addendum 1 (North Hampton-Rye 42312)
New Hampshire | State & Local Save
Due: 9/17/2026
Posted: 9/11/2026
Scope: Construction of median guardrail from NH/MA border north 3.8 miles to the Taylor River Addendum 1 (Seabrook-Hampton Falls-Hampton 45207)
New Hampshire | State & Local Save
Due: 9/17/2026
Posted: 9/10/2026